A smooth new driveway, built to last.
From the first visit to the final pass of the roller, we handle every step of your residential paving project.
What goes into a driveway that lasts
A solid base
Most driveway problems start underneath. We build and compact the base before any asphalt goes down.
Proper drainage
We grade the driveway so water runs off and away from your garage and foundation.
Hot mix asphalt
Fresh hot mix asphalt is laid at the right thickness and rolled tight for a dense, durable surface.
Clean finish
Smooth transitions at the road and garage, neat edges, and a yard left the way we found it.
See the difference
Recent paving work







How it works
Visit
We come out, measure, look at the base and drainage, and give you a clear written estimate.
Prepare
The old surface is removed where needed, and the base is graded and compacted.
Pave
We install hot mix asphalt and roll it for a smooth, even finish.
Cure
New asphalt needs time before you park on it. We will tell you exactly how long.
Common questions
How long does a driveway take to pave?
It depends on the size of the driveway and how much prep work it needs. We will give you a timeline along with your estimate.
When can I drive on my new driveway?
New asphalt needs time to harden before it can take the weight of a car. We will tell you exactly how long before you park on it.
When should a new driveway be sealcoated?
New asphalt needs time to cure before its first coat. Wait at least 60 days after paving before having it sealed.
Ready for a new driveway?
Tell us about your driveway and we will get back to you promptly with an estimate.


